资料介绍
CMU200 EVDO测试方法介绍CMU 1X EV-DO AT测试步骤
所有测试基于3GPP2 C.P0033-A
CMU200测试前的设置 1. 按”RESET”键初始化CMU200 2. 按”Menu Select”键,选择”IMT-2000 Mobile Station”中的”1X-EVDO Signaling”应用
3 接收机测试项目:
3.2.1 Demodulation of Forward Traffic Channel in AWGN 3.3.1 Receiver Sensitivity and Dynamic Range
4 发射机测试项目:
4.2.1 Time Reference 4.2.2 Waveform Quality and Frequency Accuracy 4.3 RF Output Power Requirements
4.3.1 Range of Open Loop Output Power 4.3.2 Time Response of Open Loop Power Control 4.3.3 Range of Closed Loop Power Control 4.3.4 Maximum RF Output Power 4.3.5 Minimum Controlled Output Power 4.3.6 Standby Output Power 4.3.7 RRI Channel Output Power
4.3.8 Code Domain Power
4.3.8.1 DRC Channel Output Power 4.3.8.2 ACK Channel Output Power 4.3.8.3 Data Channel Output Power 4.3.8.4 DSC Channel Output Power
4.4.1 Cond