首页|嵌入式系统|显示技术|模拟IC/电源|元件与制造|其他IC/制程|消费类电子|无线/通信|汽车电子|工业控制|医疗电子|测试测量
首页 > 分享下载 > 消费类电子 > EVDO测试步骤

EVDO测试步骤

资料介绍
EVDO测试_Step_by_Step_version_2_CMU 1X EV-DO AT测试步骤
所有测试基于3GPP2 C.P0033-A
CMU200测试前的设置 1. 按”RESET”键初始化CMU200 2. 按”Menu Select”键,选择”IMT-2000 Mobile Station”中的”1X-EVDO Signaling”应用

3 接收机测试项目:
3.2.1 Demodulation of Forward Traffic Channel in AWGN 3.3.1 Receiver Sensitivity and Dynamic Range

4 发射机测试项目:
4.2.1 Time Reference 4.2.2 Waveform Quality and Frequency Accuracy 4.3 RF Output Power Requirements
4.3.1 Range of Open Loop Output Power 4.3.2 Time Response of Open Loop Power Control 4.3.3 Range of Closed Loop Power Control 4.3.4 Maximum RF Output Power 4.3.5 Minimum Controlled Output Power 4.3.6 Standby Output Power 4.3.7 RRI Channel Output Power

4.3.8 Code Domain Power

4.3.8.1 DRC Channel Output Power 4.3.8.2 ACK Channel Output Power 4.3.8.3 Data Channel Output Power 4.3.8.4 DSC Channel Output Power

4.4.1 Cond
标签:测试version
EVDO测试步骤
本地下载

评论